Two markets in one boom, the leases not yet on the balance sheets, and how far the subprime comparison goes.
Date of value: October 22, 2026Prepared by Curtis Travis, B.Comm, AACI (retired)Informational only. Not a recommendation.
1Summary of findings
This workfile sits behind an informational post published October 22, 2026. It is not a stock pick.
The market has already split the AI borrowers. At the October 21, 2026 close, Oracle was 55% below its 52-week high and CoreWeave 56%, while Meta, Nvidia, Amazon and Microsoft were within 4% to 11% of theirs.
Companies raised about $466 billion of AI-related debt in the first nine months of 2026, against $101 billion a year earlier, according to news reports of Morgan Stanley data. The original note and its definition were not available.
In their latest SEC filings, Oracle, Microsoft, Alphabet, Meta and Amazon disclose about $1.2 trillion of leases that have not yet started, mostly for data centres. Those leases are not on the balance sheets yet.
Meta’s figure, filed October 22, 2026, is $355.7 billion, up from $103.8 billion at December 31, 2025: 3.4 times in nine months.
The phrase “eerily reminiscent of the subprime bubble” comes from an October 16, 2026 report by Americans for Financial Reform, an advocacy group. The report says it is not predicting a crash.
The securitized slice of data centre debt is reported at about $61 billion, roughly 4% of the $1.5 trillion subprime mortgage market the Chicago Fed described in 2007.
The risk sits with the weaker borrowers and with whoever holds their debt. The largest tenants are still priced as safe.
2Where the “subprime” line comes from
The quote that circulated on social media is from “Brace for Impact: Protecting People and the Economy When the AI Bubble Bursts”, by Matthew Scherer and Maya Jenkins of the Open Markets Institute, published by Americans for Financial Reform on October 16, 2026. The executive summary says speculative data centre debt is being repackaged and sold to pension and retirement funds, university endowments and other institutional investors “in a manner eerily reminiscent of the subprime bubble.”
Two things to know about the source:
It is a policy argument written to push for regulation. Its asks include more financial transparency, closing accounting loopholes, protecting pension beneficiaries and refusing bailouts of AI firms.
It says it is not predicting a crash. “Eerily reminiscent” is its own framing, not a measured comparison.
3The borrowing: how big, how fast
Measure
Value
Source
AI-related debt raised, first nine months of 2026
about $466B
News reports of Morgan Stanley data, Oct 20, 2026 (original not read)
Same period of 2025
about $101B
Same
Bonds from Alphabet, Amazon, Meta and Oracle, 2026 to July 7
about $194B
Reuters, Jul 29, 2026
Same four issuers, all of 2025
about $108B
Same
Median new-issue concession, 2026 vs 2025
12 bp vs 2.25 bp
Same
The $466 billion is 4.6 times the year-earlier figure (my arithmetic). It counts more than bonds: the four big issuers’ bonds are roughly half of it, so the rest is loans, private credit and other structures. No source reviewed gives that split, so treat the $466 billion as a reported total with an undisclosed definition. The direction is consistent across every source: borrowing is much larger than a year ago, and issuers are paying more to get deals done.
4Two markets in one boom
Company
Close, Oct 21, 2026
52-week high
Below the high
CoreWeave
$61.82
$141.79
56.4%
Oracle
$129.13
$287.19
55.0%
Alphabet
$334.76
$408.61
18.1%
Meta
$697.52
$779.82
10.6%
Nvidia
$221.97
$243.37
8.8%
Amazon
$262.37
$287.20
8.6%
Microsoft
$532.95
$553.72
3.8%
Closing prices from market data, Oct 21, 2026. The 52-week high is the intraday high. Percentages are my arithmetic.
Percent below the 52-week intraday high at the October 21, 2026 close. Market data; my arithmetic.
The two names that have lost about half their value are the ones carrying the credit stress:
Oracle was cut by S&P from BBB to BBB−, the lowest investment-grade rating, on July 9, 2026 (reported). Its borrowings were $125.3 billion at August 31, 2026, against $288 billion of leases not yet started (10-Q filed September 11, 2026).
CoreWeave reported $35.6 billion of debt principal at June 30, 2026, including $13.6 billion of project loans and $10.0 billion of unsecured notes, and $558 million of interest expense in the second quarter, 21.7% of revenue (10-Q, as summarized in news reports). Its 9.75% notes due 2031 were reported yielding about 16% on October 20, which means they trade well below face value. The 10-Q reported it was in compliance with its covenants at June 30.
5The leases not yet on the balance sheets
Each company’s latest filing, read directly on the SEC’s EDGAR system on October 22, 2026:
Company
Filing
Leases not yet commenced
Lease terms
Server life
Meta
10-Q, quarter to Sep 30, 2026, filed Oct 22
$355.7B
over 1 to 30 years
5 to 5.5 years
Microsoft
10-K, year to Jun 30, 2026, filed Jul 29
$329.1B
1 to 20 years
2 to 6 years
Oracle
10-Q, quarter to Aug 31, 2026, filed Sep 11
$288.0B
15 to 19 years
up to 6 years
Amazon
10-Q, quarter to Jun 30, 2026, filed Jul 31
$137.2B
not stated
5 to 6 years
Alphabet
10-Q, quarter to Jun 30, 2026, filed Jul 23
$85.2B
1 to 26 years
6 years
Total
latest filings, dates differ
about $1.2T
Server lives for Meta, Amazon and Alphabet are from their 2025 annual reports. The total is my arithmetic ($1,195 billion) across filings with different dates.
What the leases are for. Oracle says its commitments are “substantially all related to data center arrangements”, Microsoft “primarily for datacenters” and Alphabet “primarily related to data centers.” Meta’s include energy infrastructure, colocations and network infrastructure as well, and Amazon gives no breakdown. “Mostly data centres” is fair; “all data centres” is not.
How fast Meta’s grew. $103.8 billion at December 31, 2025, $279.0 billion at June 30, 2026 and $355.7 billion at September 30, 2026. Meta’s maximum residual value guarantees on two data centre ventures rose from $28.1 billion to $41.5 billion over the same nine months.
Off the balance sheet is not hidden. These amounts are disclosed in the notes and go on the balance sheet when each lease starts. A Moody’s accounting specialist made the same point when the agency counted $662 billion of such commitments at the end of 2025 (reported by Fortune, February 25, 2026); the filings above have since grown well past that.
Buildings, not chips. The leases are for buildings and sites. The servers inside are owned or financed separately and depreciated over 5 to 6 years at most of these companies. The real question is whether the computing pays for both before it ages.
6Securitization, and who holds the debt
Measure
Value
Source
Data centre debt securitized, through July 2026
about $61B
Industry research with Barclays data, as reported Sep 5, 2026 (primary not found)
Subprime mortgage market
$1.5T
Chicago Fed Letter No. 241, Aug 2007
Securitized slice as a share of subprime
about 4%
My arithmetic; figures from different years
Data centre debt private credit funds could hold by 2028
up to $800B
Morgan Stanley projection (Jul 2025), as cited in the AFR report
Who would bear losses: a Chicago Booth Review analysis (Stefan Hepp, August 7, 2026) puts first losses on private credit funds and AI infrastructure credit vehicles, then on their investors, principally pension plans and endowments, then on insurers owned by private equity. Banks mostly hold senior positions. His stress case is about $60 billion to $140 billion of realized credit losses; it is a stress test, not a forecast. No source reviewed named a specific pension plan, Canadian or otherwise, holding data centre bonds.
7Where the subprime comparison holds, and where it breaks
Where it holds
Securitization lets lenders pass default risk to buyers, and the AFR report draws that parallel itself.
Some loans are made on a promise to lease, before rent is being paid.
The buyers include retirement money.
Issuers are paying more to borrow, and the weakest names are priced for stress (section 4).
Where it breaks
Scale: the securitized slice is about 4% of the 2007 subprime market.
Borrowers: the main tenants are among the largest, most profitable companies in the world, not stretched households.
Structure: banks mostly hold senior positions, which are expected to take smaller losses.
The report making the comparison says it is not a prediction.
8What would change the picture
Toward real stress: a covenant breach or missed payment at a leveraged builder such as CoreWeave; a further downgrade of Oracle below investment grade; securitized data centre deals trading at deep discounts; tenants cancelling or shrinking leases before they start.
Toward a contained story: leases converting on schedule into rent that is being paid; the gap between the leveraged builders and the cash-rich tenants narrowing as earnings come in; new issues getting done without rising concessions.
What to read next: each company’s next 10-Q or 10-K, which will update the lease figures in section 5.
9Considered and rejected
Credit default swap levels for Meta, Nvidia and Oracle. Widely quoted, but the figures reviewed came from aggregators without a named data source. Left out.
“Banks have been trying for six months to sell a $38 billion loan.” Reporting reviewed shows more than two dozen lenders joined and under $1 billion was left to place. The claim as circulated is overstated.
“Fifteen-year leases on two-year chips.” The 15 to 19 year terms are Oracle’s alone, the leases are for buildings, and the filings give servers 5 to 6 years. The framing does not match the filings.
$662 billion of off-balance-sheet leases as a current figure. It is a December 31, 2025 snapshot; the filings in section 5 replace it.
Calling the leases “hidden.” They are disclosed in the notes.
Probabilities of a crash. None can be supported by the evidence, so none are given.
10Position and disclosure
When this was written (October 22, 2026) I owned shares of Amazon and Nvidia. I did not own Oracle, CoreWeave, Meta, Alphabet or Microsoft. No company is recommended in this file.